A supplier initiated the first production run for a newly released design configuration. Quality personnel treated the First Article Inspection (FAI) strictly as a standard dimensional final inspection of a completed article rather than an audit of the manufacturing sequence.
Process realization controls, including tooling suitability, sequence of operations, and sub-tier special process verification, were not reviewed concurrently with the initial run, leading to undocumented process discrepancies.
Best Practice
Conduct AS9102 FAIs as a holistic verification of the entire manufacturing system, ensuring that production planning, tooling, and controlled processes are independently validated to consistently achieve product compliance.
Reflects the recommended position based on community discussion and expert review.
Continue the conversation
Have a different interpretation or recent experience that adds nuance? The community keeps lessons sharp.
Ask LINK
Get an instant AS9102-grounded answer from our FAI assistant. The fastest path to a working answer for your own situation.