Scoping Documentation and Functional Verification in Partial FAIs
Published .
Applicable Standards
AS9102Applicable Sections
- ✓Form 1 — Part Number Accountability
- ✓Form 2 — Product Accountability
Related
- AS9100
Topics
- fai
- partial-fai
- lapse-in-production
- functional-testing
- traceability
A manufacturing supplier is executing a partial First Article Inspection (FAI) following an operational trigger, such as a prolonged lapse in production or an engineering delta change. During package assembly, uncertainty arises regarding whether unchanged sub-tier material certifications must be re-indexed and whether baseline functional testing must be re-executed.
Unclear differentiation between inherited baseline data and required re-verification leads to either administrative over-documentation or non-compliant omissions of mandatory re-testing on the active manufacturing run.
Common Mistakes
- Unclear differentiation between inherited baseline data and required re-verification leads to either administrative over-documentation or non-compliant omissions of mandatory re-testing on the active manufacturing run.
- Incorrect or incomplete Form 1 part number traceability.
- Treating a design change as a full FAI re-accomplishment instead of a partial/delta.
Best Practice
Under AS9102, establish traceability for unaffected legacy characteristics and unchanged sub-tier components by referencing the baseline FAI identifier on Form 1, while ensuring that all active process verifications, product acceptances, and functional testing impacted by the trigger event are newly performed and recorded on Forms 2 and 3.
Reflects the recommended position based on community discussion and expert review.
Continue the conversation
Have a different interpretation or recent experience that adds nuance? The community keeps lessons sharp.
Ask LINK
Get an instant AS9102-grounded answer from our FAI assistant. The fastest path to a working answer for your own situation.