Scenario

A supplier prepared to restart manufacturing of a component that had not been in production for an extended period. A previously approved First Article Inspection (FAI) was on file from the last production run. The quality organization needed to determine the validation requirements before proceeding with the new production order.

Issue

A production lapse exceeding 24 months from the completion of the final manufacturing operation had occurred. Per aerospace standards, this event triggered a mandatory re-accomplishment of the FAI, but the supplier was uncertain of the scope required.

Key Takeaways

  • Following a documented review of the manufacturing process, tooling, and design data, it was determined that a partial FAI was sufficient.
  • The delta FAI was completed to re-validate the process and product, ensuring no degradation in capability occurred during the lapse.
  • A production lapse exceeding 24 months from the completion of the final manufacturing operation had occurred.

Best Practice

When a lapse in production of two or more years occurs, organizations must perform a new FAI per AS9102. A documented review should justify the scope, ensuring that a full or partial FAI adequately re-verifies that the production processes can still produce a conforming part.

Reflects the recommended position based on community discussion and expert review.

Continue the conversation

Have a different interpretation or recent experience that adds nuance? The community keeps lessons sharp.

Ask LINK

Get an instant AS9102-grounded answer from our FAI assistant. The fastest path to a working answer for your own situation.