Clarifying Full vs. Partial First Article Inspection Triggers

Published .

Applicable Standards

AS9102

Applicable Sections

  • Form 1 — Part Number Accountability
  • Form 3 — Characteristic Accountability

Related

  • AS9100

Topics

  • fai
  • first-article-inspection
  • as9102
  • sub-assembly
  • partial-fai
  • delta-fai
  • quality-planning
Scenario

A supplier introduced a new sub-assembly part number into production. Believing that the individual components had been previously verified, the supplier performed what they considered a 'partial FAI,' focusing only on the assembly-level characteristics. They submitted an incomplete FAI package, omitting forms or data for the component-level features.

Issue

The customer rejected the FAI package as it did not comply with the governing standard, which requires a complete FAI for any new part number, including sub-assemblies. A partial, or 'delta,' FAI is only applicable for documenting changes to a part with a previously completed and approved baseline FAI.

Key Takeaways

  • The incomplete submission resulted in a product acceptance delay and a formal corrective action request.
  • The supplier was required to perform a new, complete First Article Inspection, generating all required forms to account for all product characteristics, before the part could be accepted.
  • The customer rejected the FAI package as it did not comply with the governing standard, which requires a complete FAI for any new part number, including sub-assemblies.

Common Mistakes

  • Missing balloon numbers on the drawing.
  • Title block requirements not accounted for on Form 3.
  • Incorrect or incomplete Form 1 part number traceability.
  • Treating a design change as a full FAI re-accomplishment instead of a partial/delta.

Best Practice

Ensure quality planning processes strictly adhere to AS9102 requirements, which mandate a complete baseline FAI for every new part number. Partial FAIs are not a substitute for a full FAI on a new assembly and should only be used to document the impact of specific changes against an established baseline.

Reflects the recommended position based on community discussion and expert review.

Continue the conversation

Have a different interpretation or recent experience that adds nuance? The community keeps lessons sharp.

Ask LINK

Get an instant AS9102-grounded answer from our FAI assistant. The fastest path to a working answer for your own situation.